by admin | Dec 31, 2007 | 2007, Incident
As part of NWAS (GMA) pre arranged plan to cope with peak demand calls on this festive season night, the Team was mobilised to directly assist NWAS (GMA) with ambulance calls throughout the evening, alongside our colleagues in the St John Ambulance Brigade. 11 Team... by admin | Dec 30, 2007 | 2007, Incident
As part of NWAS (GMA) pre arranged winter plan to cope with peak demand calls on this festive season night, the Team was mobilised to directly assist NWAS (GMA) with ambulance calls throughout the evening, alongside members of the Oldham MRT & our colleagues in... by admin | Dec 30, 2007 | 2007, Incident
This afternoon the Team was contacted by NWAS (Greater Manchester Area) who requested our assistance as part of their step-up resource plan given a high incident loading on their immediate resources available. Two Bolton MRT Landrover ambulances were put at the... by admin | Dec 29, 2007 | 2007, Incident
The Team was contacted by Pager by NWAS (GMA) Paramedic Emergency Control to assist NWAS with a possible peak demand loading on its resources, the Team made available 2 Mountain Rescue Landrover ambulances on standby at our LBH base. 10 incidents were attended... by admin | Dec 23, 2007 | 2007, Incident
Whilst on pre-arranged Christmas standby to assist NWAS with a possible peak demand loading on its resources (as part of its step-up plan, as per the introduction to the previous incident), the team had personnel and vehicles on standby at our LBH base. As with the... by admin | Dec 23, 2007 | 2007, Incident
This evening the team was on a pre-arranged Christmas standby for NWAS (Greater Manchester Area) with duty crews present enabling all four of our Landrover Mountain Rescue ambulances to be availble. At 21:18 the team was contacted by NWAS PEC regards responding to the...