Incident 206/2007

Incident 206/2007

As part of NWAS (GMA) pre arranged plan to cope with peak demand calls on this festive season night, the Team was mobilised to directly assist NWAS (GMA) with ambulance calls throughout the evening, alongside our colleagues in the St John Ambulance Brigade. 11 Team...
Incident 206/2007

Incident 196/2007

As part of NWAS (GMA) pre arranged winter plan to cope with peak demand calls on this festive season night, the Team was mobilised to directly assist NWAS (GMA) with ambulance calls throughout the evening, alongside members of the Oldham MRT & our colleagues in...
Incident 206/2007

Incident 186/2007

This afternoon the Team was contacted by NWAS (Greater Manchester Area) who requested our assistance as part of their step-up resource plan given a high incident loading on their immediate resources available. Two Bolton MRT Landrover ambulances were put at the...
Incident 206/2007

Incident 180/2007

The Team was contacted by Pager by NWAS (GMA) Paramedic Emergency Control to assist NWAS with a possible peak demand loading on its resources, the Team made available 2 Mountain Rescue Landrover ambulances on standby at our LBH base. 10 incidents were attended...
Incident 206/2007

Incident 170/2007

Whilst on pre-arranged Christmas standby to assist NWAS with a possible peak demand loading on its resources (as part of its step-up plan, as per the introduction to the previous incident), the team had personnel and vehicles on standby at our LBH base. As with the...
Incident 206/2007

Incident 169/2007

This evening the team was on a pre-arranged Christmas standby for NWAS (Greater Manchester Area) with duty crews present enabling all four of our Landrover Mountain Rescue ambulances to be availble. At 21:18 the team was contacted by NWAS PEC regards responding to the...